Because of the growing demand for water, Pinewood’s Water District designed a plan that included installing large-diameter pipe, and the reservoir’s construction. The pictures below show the projects from inception to completion. Approximate date; from inception in 2000 to 2009 when the reservoir was first filled.
Trenching and Pipe Laying
Crow Lane Reservoir